Ebb Valley Elementary School

School Header

Page 12

 

The terrazzo floors are being finished.

 

The kitchen appliances are set in place.

 

The equipment racks are being installed in the data room.

 

An inside look at the HVAC equipment.

 

Another view of the HVAC equipment in the penthouse.