Ebb Valley Elementary School

School Header

Page 14

 

The serving line is being installed.

 

The cash register table is set in place.

 

The sinks and preparation area are being installed in the kitchen.

 

The sunshades are installed on the second floor windows.

 

HVAC duct work is being installed in the penthouse.