Ebb Valley Elementary School

School Header

Page 24

Photo page 24

 


The cafeteria floor is installed.



Sod is installed near the blacktop playground.




Playground fencing is installed.




The cafeteria floor from the loading dock hallway.




The cafeteria floor from the hall entrance.




The gym floor takes shape.




Stacks of sod are lined up waiting for installation




More sod is set in place.





The sod is installed along the back sidewalk.



The freshly laid sod gets watered.




Additional sod is stacked waiting to be installed.