Ebb Valley Elementary School

School Header

Page 7

 

Ceiling grids are installed.

 

Siding panels are put in place.

 

The installers check to make sure the siding is straight.

 

Exterior lights are erected in the bus loop.

 

Samples of terrazzo floors.